Some construction site pictures give you a little insight into the versatile application areas of my activity
 -   
 Waste heat boiler vertical design (CCGT - power plant 2005)Thessaloniki 
-   
 Intake gas turbine 9FA of General Electric (CCGT - plant 2006)Termoli 
-   
 2 waste heat boilers from Aalborg each 85 MW th (CCGT - plant 2006)Antwerp 
-   
 Biomassekraftwerk 2006/2007Falun 
-  Throw feeder on fluidized bed furnace (sludge incineration-recompression plant 2007)St.Petersburg 
-  Wire, tapped - condensing turbine 240 MW (gas and steam - plant 2008)Vienna 
-  Thin Film Dryer-out plated rotor (sludge incineration 2010)Widnes 
-  Wet scrubbers for RG - desulfurization (lignite power plant - 2010)Maritza East 1 
-  incineration 2011Moorburg 
-    Coal-fired power plant in Hamburg (Moorburg) 1640 MWMoorburg 
-    OF - Steinkohlekraftwerk Eemshaven 1600 MW 2013Eemshaven 
-  Runcorn TPS - 4 - lines Incinerator 2014Runcorn TPS 
-    Maasvlakte (Rotterdam) 2015 Steinkokohle KW 1200 MW of EONmaasvlakte 
 
  
  
  
 
